Got more done today. The wall is back together and I added diagonal 2x4's rather than the light 1x4 strapping. 3/4" plywood braces for the wall to roof joint as well as the roof peak. The tarp door is secured by drilling 2x4's vertically along the edge to the frame. Made for a nice tight sandwich. I am going to do the same to secure the shrinkwrap with the strapping. That leaves patching the holes and upgrading the ground anchors left to do.
The auger style anchor won't work. Nor digging down. The soil is soft dirt for the first foot then rocks and roots the rest of the way. The pigtail version can get through with effort as long as it doesn't twist apart like the cheap HD version. Another option is hammering a stake like for a tent but with a T for the top to catch the lip of the wood.
|