Classic SeaCraft Community  

Go Back   Classic SeaCraft Community > Recovered Threads

Notices

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 03-26-2015, 02:38 PM
martin martin is offline
Senior Member
 
Join Date: Jan 2007
Location: panama City Fl.
Posts: 1,061
Default Boat restore Co

Hi guys I have decided to farm out the rest of the work to a local Co. I have seen his work and spoke to him a number of times and checked his references. My Deal with him. is that I give him my 20 seacarft hull, trailer and Engine. plus bracket I built for it and rigging, In exchange for him to finish the 23 seacraft with the topcoat of my choice. this includes all fiberglass work needed to be done and custom work as well. Floor needs to be finished , console needs to be modified and installed,lots of fairing. Rub rail needs to built, anchor locker needs to be installed and hatches need to be built and installed. there will be gel coating and fairing ,primer and paint. all algrip products. My question is how to I put this in a binding contract. Does anyone have any ideas as to how to put this deal together. I will not surrender 20ft seacraft till mine 23 is finished. Thanks in advanced.. I just ran out of steam. I have to many projects that wife is wanting done...MJ
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:36 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft